1.
Muhamaddan AK, Ahyudanari E. Evaluation of Value Engineering Potential in Work Methods and Design of the Primary Canal in the Post-Disaster Gumbasa Irrigation Project. jrssem [Internet]. 2025 Aug. 8 [cited 2025 Dec. 5];5(1):2683-97. Available from: https://jrssem.publikasiindonesia.id/index.php/jrssem/article/view/941