1.
Herkunadi DF, Witjaksana B. Analysis of Acceleration Construction Project the Lecture Building at Politeknik Negeri Madura Using the Time Cost Trade off Method. jrssem [Internet]. 2025 Jun. 28 [cited 2025 Dec. 5];4(11):2057-69. Available from: https://jrssem.publikasiindonesia.id/index.php/jrssem/article/view/909