Faris Djunaedy, Muhammad, and Mohammad Isa Irawan. “Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling”. Journal Research of Social Science, Economics, and Management, vol. 6, no. 1, Aug. 2026, pp. 452-70, doi:10.59141/jrssem.v6i1.1663.