[1]
D. F. Herkunadi and B. . Witjaksana, “Analysis of Acceleration Construction Project the Lecture Building at Politeknik Negeri Madura Using the Time Cost Trade off Method”, jrssem, vol. 4, no. 11, pp. 2057–2069, Jun. 2025.