[1]
M. Faris Djunaedy and M. Isa Irawan, “Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling”, jrssem, vol. 6, no. 1, pp. 452–470, Aug. 2026.