[1]
R. M. Bagas Wicaksono and F. Rachmawati, “Integration of Cost of Quality and Risk Analysis to Reduce Failure Costs in the KIIC Margakarya 150 KV Substation Civil Engineering Project”, jrssem, vol. 6, no. 1, pp. 434–451, Aug. 2026.