Faris Djunaedy, M. and Isa Irawan, M. (2026) “Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling”, Journal Research of Social Science, Economics, and Management, 6(1), pp. 452–470. doi: 10.59141/jrssem.v6i1.1663.