Faris Djunaedy, Muhammad, and Mohammad Isa Irawan. 2026. “Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling”. Journal Research of Social Science, Economics, and Management 6 (1):452-70. https://doi.org/10.59141/jrssem.v6i1.1663.