FARIS DJUNAEDY, Muhammad; ISA IRAWAN, Mohammad. Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling. Journal Research of Social Science, Economics, and Management, [S. l.], v. 6, n. 1, p. 452–470, 2026. DOI: 10.59141/jrssem.v6i1.1663. Disponível em: https://jrssem.publikasiindonesia.id/index.php/jrssem/article/view/1663. Acesso em: 26 aug. 2026.