(1)
Bagas Wicaksono, R. M.; Rachmawati, F. Integration of Cost of Quality and Risk Analysis to Reduce Failure Costs in the KIIC Margakarya 150 KV Substation Civil Engineering Project. jrssem 2026, 6, 434-451.