[1]
Kusuma Anuraga, H.Y. and Yudoko, G. 2025. A Practical Recovery Strategy for Delayed Construction Project: Insights from a Geothermal Cooling Tower Case. Journal Research of Social Science, Economics, and Management. 4, 12 (Jul. 2025), 2147–2153. DOI:https://doi.org/10.59141/jrssem.v4i12.902.