Faris Djunaedy, M. and Isa Irawan, M. 2026. Optimization of the Duration of a Steam Power Plant Overhaul Project Using Resource-Constrained Critical Path Method (RCPM)-Based Scheduling. Journal Research of Social Science, Economics, and Management. 6, 1 (Aug. 2026), 452–470. DOI:https://doi.org/10.59141/jrssem.v6i1.1663.